About

Log in?

DTU users get better search results including licensed content and discounts on order fees.

Anyone can log in and get personalized features such as favorites, tags and feeds.

Log in as DTU user Log in as non-DTU user No thanks

DTU Findit

Journal article

Energy, material and land requirement of a fusion plant

From

Risø National Laboratory for Sustainable Energy, Technical University of Denmark1

The energy and material necessary to construct a power plant and the land covered by the plant are indicators for the ‘consumption’ of environment by a certain technology. Based on current knowledge, estimations show that the material necessary to construct a fusion plant will exceed the material requirement of a fission plant by a factor of two.

The material requirement for a fusion plant is roughly 2000 t/MW and little less than 1000 t/MW for a fission plant. The land requirement for a fusion plant is roughly 300 m2/MW and the land requirement for a fission plant is a little less than 200 m2/MW. The energy pay back time, defined later in Section 6, is little more than half a year for a fusion plant with capacity 1 GWe.

Only the electrical energy is accounted for as released energy not the thermal energy. In all these indicators, fusion compares well with conventional technologies while it consumes less ‘environment’ for the construction than renewable technologies, especially wind and solar.

Language: English
Year: 2001
Pages: 1081-1085
ISSN: 18737196 and 09203796
Types: Journal article
DOI: 10.1016/S0920-3796(01)00553-1

DTU users get better search results including licensed content and discounts on order fees.

Log in as DTU user

Access

Analysis