About

Log in?

DTU users get better search results including licensed content and discounts on order fees.

Anyone can log in and get personalized features such as favorites, tags and feeds.

Log in as DTU user Log in as non-DTU user No thanks

DTU Findit

Interpreted as:

title:(Integrating AND robust AND timetabling AND in AND line AND plan AND optimization AND for AND railway AND systems)

Suggestions: Include records that partially match the query

Filter results
Access
Type
Language
Year
From DTU
Advanced
1 Report

Integrating robust timetabling in line plan optimization for railway systems

The line planning problem in rail is to select a number of lines froma potential pool which provides sufficient passenger capacity and meetsoperational requirements, with some objective measure of solution linequality. We model the problem of minimizing the average passenger systemtime, including

Year: 2016

Language: English

em ih oakpcgfdj bln
2 Journal article

Integrating robust timetabling in line plan optimization for railway systems

We propose a heuristic algorithm to build a railway line plan from scratch that minimizes passenger travel time and operator cost and for which a feasible and robust timetable exists. A line planning module and a timetabling module work iteratively and interactively. The line planning module

Year: 2017

Language: English

gklcdhnabmjfpe oi

DTU users get better search results including licensed content and discounts on order fees.

Log in as DTU user