About

Log in?

DTU users get better search results including licensed content and discounts on order fees.

Anyone can log in and get personalized features such as favorites, tags and feeds.

Log in as DTU user Log in as non-DTU user No thanks

DTU Findit

Report · Printed book

Wind power projects in the CDM: Methodologies and tools for baselines, carbon financing and substainability analysis

From

Risø National Laboratory for Sustainable Energy, Technical University of Denmark1

Systems Analysis Division, Risø National Laboratory for Sustainable Energy, Technical University of Denmark2

The report is intended to be a guidance document for project developers, investors, lenders, and CDM host countries involved in wind power projects in the CDM. The report explores in particular those issues that are important in CDM project assessment and development—that is, baseline development, carbon financing, and environmental sustainability.

It does not deal in detail with those issues that are routinely covered in a standard wind power project assessment. The report tests, compares, and recommends methodologies for and approaches to baseline development. To present the application and implications of the various methodologies and approaches in a concrete context, Africa’s largest wind farm—namely the 60 MW wind farm located in Zafarana, Egypt—is examined as a hypothetical CDM wind power project.

The report shows that for the present case example there is a difference of about 25% between the lowest (0.5496 tCO2/MWh) and the highest emission rate (0.6868 tCO2/MWh) estimated in accordance with these three standardized approaches to baseline development according to the Marrakesh Accord. This difference in emission factors comes about partly as a result of including hydroelectric power in the baseline scenario.

Hydroelectric resources constitute around 21% of the generation capacity in Egypt, and, if excluding hydropower, the difference between the lowest and the highest baseline is reduced to 18%. Furthermore, since the two variations of the “historical” baseline option examined result in the highest and the lowest baselines, by disregarding this baseline option altogether the difference between the lowest and the highest is reduced to 16%.

The ES3 -model, which the Systems Analysis Department at Risø National Laboratory has developed, makes it possible for this report to explore the project-specific approach to baseline development in some detail. Based on quite disaggregated data on the Egyptian electricity system, including the wind power production profile of Zafarana, the emission rates estimated by runs with 1 hour time-steps of the simulation tool ES3 range from 0.590 tCO2/MWh to 0.610 tCO2/MWh.

These results come very close to estimates based on two different interpretations of standardized baseline options above.

Language: English
Publisher: Risø National Laboratory
Year: 2002
Pages: 111 s.
Series: Denmark. Forskningscenter Risoe. Risoe-r
ISBN: 8755031528 and 9788755031524
ISSN: 01062840
Types: Report and Printed book
ORCIDs: Grohnheit, Poul Erik , Nielsen, Lars Henrik and Painuly, Jyoti

DTU users get better search results including licensed content and discounts on order fees.

Log in as DTU user

Access

Analysis