About

Log in?

DTU users get better search results including licensed content and discounts on order fees.

Anyone can log in and get personalized features such as favorites, tags and feeds.

Log in as DTU user Log in as non-DTU user No thanks

DTU Findit

Journal article

Reliability-based Topology Optimization for Offshore Wind Farm Collection System

From

System Engineering and Optimization, Wind Energy Systems Division, Department of Wind Energy, Technical University of Denmark1

Department of Wind Energy, Technical University of Denmark2

Comillas Pontifical University3

GRID Integration and Energy Systems, Wind Energy Systems Division, Department of Wind Energy, Technical University of Denmark4

An optimization framework for global optimization of the cable layout topology for Offshore Wind Farm (OWF) is presented. The framework designs and compares closed-loop and radial layouts for the collection system of OWFs. For the former, a two-stage stochastic optimization program based on a Mixed Integer Linear Programming (MILP) model is developed, while for the latter, a hop-indexed full binary model is used.

The purpose of the framework is to provide a common base for assessing both designs economically, using the same underlying contingency treatment. A discrete Markov model is implemented for calculating the cable failure probability, useful for estimating the time under contingency for multiple power generation scenarios.

The objective function supports simultaneous optimization of: (i) initial investment (network topology and cable sizing), (ii) total electrical power losses costs, and (iii) operation costs due to energy curtailment from cables failures. Constraints are added accounting for common engineering aspects.

The applicability of the full method is demonstrated by tackling three differently sized real-world OWFs. Results show that: (i) the profitability of either topology type depends strongly on the project size and wind turbine rating. Closed-loop may be a competitive solution for large-scale projects where large amounts of energy are potentially curtailed. (ii) The stochastic model presents low tractability to tackle large-scale instances, increasing the required computing time and memory resources. (iii) Strategies must be adopted in order to apply stochastic optimization for modern OWFs, intending analytically or numerically simplification of mathematical models.

Language: English
Publisher: Wiley
Year: 2022
Pages: 52-70
ISSN: 10991824 and 10954244
Types: Journal article
DOI: 10.1002/we.2660
ORCIDs: Pérez-Rúa, Juan-Andrés , Cutululis, Nicolaos A. , 0000-0002-5506-9027 and 0000-0002-8871-1872

DTU users get better search results including licensed content and discounts on order fees.

Log in as DTU user

Access

Analysis