About

Log in?

DTU users get better search results including licensed content and discounts on order fees.

Anyone can log in and get personalized features such as favorites, tags and feeds.

Log in as DTU user Log in as non-DTU user No thanks

DTU Findit

Conference paper

Gain scheduling using the Youla parameterization

From

Department of Automation, Technical University of Denmark1

Aalborg University2

Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use of the Youla parameterization in connection with estimation of the vector directly gives a validation method for the estimate of the vector.

The validation part is an integrated part of the estimation method. This will make it possible to estimate the parameter vector very precisely. This is important in connection with H_inf gain scheduling controllers.

Language: English
Publisher: IEEE
Year: 1999
Pages: 2306-2311
Proceedings: 38th IEEE Conference on Decision and Control
ISBN: 0780352505 and 9780780352506
ISSN: 01912216
Types: Conference paper
DOI: 10.1109/CDC.1999.831265
ORCIDs: Niemann, Hans Henrik

DTU users get better search results including licensed content and discounts on order fees.

Log in as DTU user

Access

Analysis