The aim of this case study was to (1) investigate differences in mechanical exposure (i.e. mechanical forces arising in the body of the operator) between two production strategies: long-cycle parallelised flow assembly (OLD) and conventional serial flow assembly (NEW), and (2) estimate potential changes in job exposure as a consequence of waste reduction when rationalising a line system.Data on postures, movements and whole body exposure were collected during an ordinary working shift, by means of video recordings synchronised to direct technical measurements of six professional operators.The results revealed the machine paced NEW system to have slower movements with less time spent in movements of high velocity compared to the self-paced OLD system.
No significant differences were found between time-median posture levels. ‘Disturbances’ in the NEW system offered lower mechanical risk exposures compared to direct assembly work. Modelling the removal of wasteful ‘disturbances’ revealed both an increase in risk-implying fast movements and decrease in recovery-implying periods at low velocity – effectively isolating a work intensification.
This study helps expose the complex relationship between rationalizations and mechanical exposure for system operators.
Language: | English |
---|---|
Year: | 2012 |
Pages: | 1110-1121 |
ISSN: | 18729126 and 00036870 |
Types: | Journal article |
DOI: | 10.1016/j.apergo.2012.04.001 |
DW - direct assembly work DfM - design for manufacturability HRR - heart rate ratio IW - indirect assembly work VAW - value-adding work WI - work intensification
Adult Assembly work Automobiles Biomechanical Phenomena Electromyography Female Humans Industry Male Movement Muscle, Skeletal Musculoskeletal Diseases Neck Occupational Diseases Posture Production system design Simulation modelling Statistics, Nonparametric Sweden Task level exposure analysis Upper Extremity Video Recording Workload