About

Log in?

DTU users get better search results including licensed content and discounts on order fees.

Anyone can log in and get personalized features such as favorites, tags and feeds.

Log in as DTU user Log in as non-DTU user No thanks

DTU Findit

Journal article

Improving the quotation process with product configuration

From

Department of Management Engineering, Technical University of Denmark1

How can product configuration support the process of engineering highly complex industrial products? This article describes how an IT-based product configuration system was developed to support the process of mak-ing budget quotations. The article is based on a research project carried out as collaboration between the Centre for Product Modelling at the Technical University of Denmark and a Danish cement plant manufacturer.

A pro-cedure for building product models developed by the Centre for Product Modelling was tested empirically at the company during the project. The system was developed from 1998 – 1999, and the configuration system has now been in operation for more than three years during which period significant results have been achieved.

The lead time for making budget quotations has been reduced from 2-5 weeks to 1-3 days. The quotations are more consistent and easy to read with focus on the big issues of the cement plant. The configuration system makes it possible to optimise the cement factories with respect to performance, an increased use of the com-pany’s components, and with respect to the use of previously manufactured components.

Finally, the engineer-ing resources used for making a budget quotation have been significantly reduced.

Language: English
Year: 2006
Pages: 607-621
ISSN: 18726194 and 01663615
Types: Journal article
DOI: 10.1016/j.compind.2005.10.001
ORCIDs: Hvam, Lars

DTU users get better search results including licensed content and discounts on order fees.

Log in as DTU user

Access

Analysis