About

Log in?

DTU users get better search results including licensed content and discounts on order fees.

Anyone can log in and get personalized features such as favorites, tags and feeds.

Log in as DTU user Log in as non-DTU user No thanks

DTU Findit

Conference paper

Quality in Construction- A Supply Chain Perspective

In Proceedings 22nd Annual Arcom Conference — 2006, pp. 459-471

Edited by Boyd, David

From

Section for Planning and Management of Building Processes, Department of Civil Engineering, Technical University of Denmark1

Department of Civil Engineering, Technical University of Denmark2

Often the construction supply chain is perceived as consisting of two intertwined streams; a stream of materials and a stream of immaterial informational character. Moreover the supply delivery would be characterized by configuration by project. That this configuration is not always successful can be demonstrated by studying the emergence of failures occurring in the supply chain.

The paper conceptualises the construction supply as a delivery network being partially stable, partially project specific and configured. It moreover develops a frame of understanding of the handling of quality issues in the delivery network, using operation management approaches. The paper presents case study work done in Danish construction.

The method was observation of work at the construction site followed by interviews with actors backwards upstream the supply chain to the origin of the failure. The building project followed generated 160 failures over a three month observation period. The economic consequences are calculated to 8% of the production costs.

The analysis of relations in the supply network showed that most of the failures were generated in the knowledge stream and then occasionally transformed into the material stream. The paper proposes initiatives to strengthen partnerships in supply chains, especially at mixed stable and project configured types.

The contradiction between permanent enterprise organisations potentially capable of handling purchasing and the role of the project manager is discussed as a contradiction to overcome.

Language: English
Publisher: ARCOM, Association of Researchers in Construction Management
Year: 2006
Edition: 1
Pages: 459-471
Proceedings: 22nd Conference Association of Researchers in Construction Management
ISBN: 0955239001 and 9780955239007
Types: Conference paper
ORCIDs: Larsen, Casper Schultz

DTU users get better search results including licensed content and discounts on order fees.

Log in as DTU user

Access

Analysis