About

Log in?

DTU users get better search results including licensed content and discounts on order fees.

Anyone can log in and get personalized features such as favorites, tags and feeds.

Log in as DTU user Log in as non-DTU user No thanks

DTU Findit

Printed book · Report

Offshore Wind Power Experiences, Potential and Key Issues for Deployment

From

Wind Turbines, Wind Energy Division, Risø National Laboratory for Sustainable Energy, Technical University of Denmark1

Wind Energy Division, Risø National Laboratory for Sustainable Energy, Technical University of Denmark2

Risø National Laboratory for Sustainable Energy, Technical University of Denmark3

Energy Systems Analysis, Systems Analysis Division, Risø National Laboratory for Sustainable Energy, Technical University of Denmark4

Systems Analysis Division, Risø National Laboratory for Sustainable Energy, Technical University of Denmark5

Wind Energy Systems, Wind Energy Division, Risø National Laboratory for Sustainable Energy, Technical University of Denmark6

Wind power has been growing at spectacular rates. Today it is the largest non-hydro renewable power technology. Worldwide there is 74 GW of installed capacity which is 1.7% of power generation capacity and in 2006 it accounted for 0.82% of electricity production. However, offshore wind still only counts for a very small amount and development has only taken place in North European counties round the North Sea and the Baltic Sea over the last 15 years.

Offshore wind is still some 50% more expensive than onshore wind, but more wind resources and lesser visual impacts from larger turbines are expected to compensate for the higher installation costs in the long term. Most offshore wind farms are installed in British, Swedish and Danish waters, and present-day costs of installing wind energy in the UK are between 1,200 to 1,600 £/kW (1,781 to 2,375 €/kW) offshore, while in Sweden investment costs were 1,800 €/kW, and in Denmark 1,200 to 1,700 €/kW, though investment costs for a new wind farm are expected be in the range of 2.0 to 2.2 mill. €/MW for a near-shore shallow depth facility.

Future developments in offshore wind technology concerning aerodynamics, structural dynamics, structural design, machine elements, electrical design and grid integration could drive investment costs from present-day range of 1.9 to 2.2 mill.€/MW down to 1.35 - 1.54 mill.€/MW in 2050, which accounts for a reduction of costs of approx. 35% .

In order to sum up progress and identify future research needs, the International Energy Agency (IEA) Wind agreement Task 11 should arrange a new meeting concerning long term research needs for reviewing “the long term strategy for 2000 to 2020” from 2001, to come up with suggestions / recommendations on how to define and proceed with, the necessary research activities of the IEA Wind Agreement and governments involved on key wind issues related to offshore technologies.

Language: English
Publisher: Danmarks Tekniske Universitet, Risø Nationallaboratoriet for Bæredygtig Energi
Year: 2009
Pages: 26 s.
Series: Denmark. Forskningscenter Risoe. Risoe-r
ISBN: 8755037259 , 9788755037250 and 9788755037259
ISSN: 01062840
Types: Printed book and Report
ORCIDs: Morthorst, Poul Erik and Clausen, Niels-Erik

DTU users get better search results including licensed content and discounts on order fees.

Log in as DTU user

Access

Analysis